{"id":2719,"date":"2026-11-25T13:18:48","date_gmt":"2026-11-25T06:18:48","guid":{"rendered":"https:\/\/kmunion.vn\/en\/?p=2719"},"modified":"2026-11-25T13:18:48","modified_gmt":"2026-11-25T06:18:48","slug":"multi-storey-warehouse-logistics-centre-area-vietnam","status":"publish","type":"post","link":"https:\/\/kmunion.vn\/en\/multi-storey-warehouse-logistics-centre-area-vietnam.html","title":{"rendered":"How Does Vietnam Count Multi-Storey Warehouse Area for Logistics Centre Classification?"},"content":{"rendered":"<p><strong>A three-storey warehouse may count more area for Vietnam&#8217;s logistics centre classification than the land parcel alone suggests.<\/strong> Article 4(3) of Circular 71\/2026\/TT-BCT converts the total usable floor area of a multi-storey building into an equivalent land area at a 1:1 ratio. The Circular takes effect on <strong>8 January 2027<\/strong>. Meeting an area threshold, however, does not by itself establish a logistics centre&#8217;s class or authorise every service carried out there.<\/p>\n<h2>How should usable floor area be calculated?<\/h2>\n<p>Add the usable area of each storey. For example, three floors of 10,500 m\u00b2 each produce 31,500 m\u00b2, or 3.15 hectares of equivalent area. This is only an arithmetic example. Do not add the land directly underneath those same floors a second time. Where a site also contains open yards, a single-storey building or shared facilities, show each component separately on a site plan and explain the calculation. Reconcile marketing figures with drawings and the area actually available for the centre&#8217;s use.<\/p>\n<h2>Does 3.15 hectares qualify the facility as a Class III centre?<\/h2>\n<p>Not automatically. Article 7 states an area range of 3 to under 10 hectares for Class III, alongside criteria for location, throughput, warehouse management systems, automation, green infrastructure and functions. Article 8 sets separate criteria for the <em>type<\/em> of centre, including at least three logistics services. Start with the definition in Article 3: an independent warehouse is not necessarily a logistics centre merely because its floor area reaches a number in the table.<\/p>\n<h2>Which entity can support the self-declaration?<\/h2>\n<p>Many sites have a property owner, a warehouse operator and separate transport or fulfilment providers. Under Article 9, the organisation or individual managing and operating the centre assesses and declares its class, type and capacity, and is responsible for accuracy. Map each service to the entity actually providing it, the contract supporting that arrangement and the capacity already in operation. Separate committed operations from planned investment. This matters when several companies&#8217; capabilities are presented as one centre.<\/p>\n<h2>Where is the information published?<\/h2>\n<p>Before the national commercial infrastructure database is officially operational, Article 10 provides for publication on the declaring entity&#8217;s official website. Within <strong>five working days after completing the publication or an update<\/strong>, the entity must notify the relevant state management authority where the centre has its head office, enclosing the URL and a copy of the information. Once the database becomes officially operational, declarations and updates are made on the system. Check the actual status of TradeNode.vn and the competent local contact when acting; the five-day period does not begin simply because the Circular becomes effective.<\/p>\n<h2>A practical preparation file<\/h2>\n<p>For each site, prepare a matrix linking every criterion to a figure, supporting document and person who can confirm it. Include usable floor areas, access roads and vehicle space, annual handling capacity, services actually delivered, WMS\/TMS and data connections, environmental and safety arrangements, and any specialist approvals. Self-declaration under Circular 71 does not replace permits or confirmations required for particular regulated activities.<\/p>\n<h2>How KM Union can assist<\/h2>\n<p>KM Union can review the legal scope of the Circular, the documentation behind a proposed declaration, arrangements among owners and operators, and specialist conditions requiring separate checks. If you are planning or operating a multi-storey warehouse in Vietnam, <a href=\"https:\/\/kmunion.vn\/en\/contact\">contact KM Union<\/a> with the site plan and intended service model to discuss the appropriate review scope.<\/p>\n<h2>Official Vietnamese sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/datafiles.chinhphu.vn\/cpp\/files\/vbpq\/2026\/11\/71-bct.signed.pdf\">Circular 71\/2026\/TT-BCT<\/a>, Articles 3\u201310 and 14, and Appendix I.<\/li>\n<li><a href=\"https:\/\/chinhphu.vn\/?classid=1&#038;docid=220328&#038;pageid=27160&#038;typegroupid=6\">Government document record<\/a> confirming issue and effective dates.<\/li>\n<\/ul>\n<p><em>Reviewed on 25 November 2026. The Circular has not yet taken effect as of this date. This article is general information, not advice on a particular facility. Classification and sector-specific requirements require review of the actual site and operations; no outcome is guaranteed. The Vietnamese text governs.<\/em><\/p>\n<p>Ti\u1ebfng Vi\u1ec7t: <a href=\"https:\/\/kmunion.vn\/kho-nhieu-tang-dien-tich-trung-tam-logistics.html\" hreflang=\"vi\">Kho nhi\u1ec1u t\u1ea7ng t\u00ednh di\u1ec7n t\u00edch th\u1ebf n\u00e0o?<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vietnam Circular 71\/2026\/TT-BCT allows usable floor area in multi-storey facilities to be converted 1:1 for logistics centre classification from 8 January 2027. What should operators document?<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[81],"tags":[],"_links":{"self":[{"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/posts\/2719"}],"collection":[{"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/comments?post=2719"}],"version-history":[{"count":1,"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/posts\/2719\/revisions"}],"predecessor-version":[{"id":2720,"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/posts\/2719\/revisions\/2720"}],"wp:attachment":[{"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/media?parent=2719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/categories?post=2719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kmunion.vn\/en\/wp-json\/wp\/v2\/tags?post=2719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}